Exforsys

Free Training

Risk-Based Test Reporting

This is a discussion on Risk-Based Test Reporting within the Testing Tutorials forums, part of the Articles and Tutorials category; Suppose we have done a risk analysis and all tests for all test stages are related to a risk. We ...

Go Back   Exforsys > Articles and Tutorials > Testing Tutorials

Exforsys.com


Testing Tutorials Testing Tutorials and Articles Discussions

Reply

 

LinkBack Thread Tools Search this Thread
  #1 (permalink)  
Old 09-21-2005, 03:24 AM
Senior Member
 
Join Date: Nov 2004
Posts: 579
JobHelper is on a distinguished road
Post Risk-Based Test Reporting

Suppose we have done a risk analysis and all tests for all test stages are related to a risk. We can obviously say at the start of system test execution that none of the test objectives have been met. Because test objectives all relate to a single risk, we can therefore say: At the start of test exe

http://www.geekarticles.com/article/...Reporting.html
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Sponsored Links
Reply

Bookmarks

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -4. The time now is 11:26 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.3.0
Copyright 2004 - 2009 Exforsys Inc. All rights reserved.